GE Frame 9 gas turbine spare parts - matched part references — Frame 9 series; Frame 9E for the operator-specific shroud entry
| برند / سازنده | GE |
|---|---|
| مدل | Frame 9 series; Frame 9E for the operator-specific shroud entry |
| نوع تجهیز | Gas turbine spare-parts reference catalogue |
| شناسه فهرست ETECH | ETECH-PARTLIST-GE-FRAME9-20261014 |
GE Frame 9 gas turbine parts reference list
Equipment brand: GE. Equipment series: Frame 9. The part descriptions and reference numbers below match the published lists of two suppliers. Those lists are closely similar; they establish matching published identifiers, not independent OEM approval or confirmed interchangeability. An exact Frame 9 subtype is not established for every entry.
Major assemblies and component groups
| Part name | Published part reference |
|---|---|
| Fuel nozzle assembly | 149D2992G023 |
| Transition-piece assembly | 101E2538G010 |
| Forward support, left | 143D7482G005 |
| Forward support, right | 143D7482G006 |
| Combustion liner | 111E8962G002 |
| Crossfire tube | 156D2096G001; 178C6651G001 |
Minor replacement items and hardware
| Part name | Published part reference |
|---|---|
| Fuel-nozzle gasket | 314A5326P001 |
| Fuel-nozzle pigtail gasket | 226A1049P047; 318A9701P004 |
| Fuel-nozzle / fuel-manifold gasket | 255A4880P027; 202A4594P061 |
| Spiral-wound can-cover gasket | 318A9713P024 |
| Transition-piece side seal | 197C3121G001 |
| Transition-piece side-seal block | 237B2743G002 |
| Transition-piece side-block bolt | 186C1916P049 |
| Transition-piece side-seal bolt | 219B6763P005 |
| Forward support bolt | 185C1916P014 |
| Forward support lockplate | 219B6764P001 |
| Transition-piece aft-bracket bolt | 186C1916P022 |
| Transition-piece aft-bracket lockplate | 219B6763P001 |
| Crossfire-tube retainer | 178C6655P001 |
| Flow-sleeve bolt | N733AP25012 |
| Combustion can-cover bolt | N733AP35048 |
| Fuel-nozzle bolt | N733AP35032 |
| Spark-plug bolt | N733AP29028 |
| Spark-plug gasket | 324A9109P124 |
| Bearing 2 vent gasket | 255A4880P017; 302A4594P017 |
| Bearing 2 drain packing | 211A8882P010 |
| Bearing 2 drain gasket | 302A4301P001; 328A6991P001 |
Where multiple references appear in one row, both are reported in the source listings. Do not assume that one supersedes or replaces another without confirmation against the applicable OEM parts catalogue. Major and minor are catalogue navigation groups, not maintenance-interval or safety-criticality classifications.
Cross-checked Frame 9E operator reference
| Part name | Equipment brand / model | Part reference |
|---|---|---|
| Third-stage turbine shroud | GE / Frame 9E | 101T7526G001 |
This reference is also documented in public procurement records from BPDB and PPCL. It applies to the configurations documented in those records; check the installed unit and drawing revision.
Sources and verification scope
- Published GE Frame 9 supplier reference list
- Published GE Frame 9 supplier reference list
- BPDB Frame 9E capital-spares procurement reference
- PPCL public equipment-spares record hosted by DERC
References reviewed: 14 October 2026. Source dates and configurations differ; no current stock, price, delivery time or OEM authorization is asserted.
Prepare a supply enquiry
Send the exact turbine model and serial number, full part reference including every suffix, component position, drawing revision and required quantity. State whether the requirement is for a complete assembly or an individual item. ETECH GROUP reviews the procurement scope and technical match before quotation. This is a selected reference list, not a complete serial-specific bill of materials.
Reference URLs for the product register
- https://www.drillingsolutionsltd.com/ge-frame-9-gas-turbine-parts.html
- https://willwaytech.com/?a=index&aid=2676&c=View&lang=en&m=home
- https://misc.bpdb.gov.bd/storage/tender/tender_20783_1.pdf
- https://www.derc.gov.in/sites/default/files/PPCL_Petition%20for%20True-up%20of%20FY%202019-20%20and%20ARR%20for%20FY%202021-22.pdf